Large Concrete Radiological Shielding Pit Lid Prototype

Large Concrete Radiological Shielding Pit Lid Prototype

Call for Tenders

Large Concrete Radiological Shielding Pit Lid Prototype

Reference: T/MN017/19

Description: The European Spallation Source (ESS) Active Cells Facility (Lund, Sweden) will be used to remotely handle and process target station components before shipment to an external waste disposal facility. The Pit Lids are responsible for providing radiological protection such that the 6 Pit Cells are shielded from maintainers in the Maintenance Area. The Contractor shall carry out manufacture and delivery (including all required testing, verification and inspection documentation) of the Active Cells Storage Pit Lids. The Storage Pit Lids consist of 17 concrete sections totalling 400 tonnes and to be installed at the ESS facility.

Prototype strategy

A single pit lid section is to be constructed ahead of the full scope to assess ease of manufacture. Prototype is to be constructed to the same standard as production (including all testing, verification and inspection documentation). Detailed design will be provided by RACE. Successful prototype manufacture shall allow UKAEA to proceed with the remaining lid sections.

Scope (prototype)

  • 1x storage pit lid sections
  • 1x pit lid locating features
  • Including, but not limited to, lifting eyes, locating fixtures & position markers etc.

Scope (full)

Manufacture and delivery (including all required testing, verification and documentation) to a design specified by RACE of the following:
  • 17x storage pit lid sections
  • 6x pit lid locating features
  • Including, but not limited to, lifting eyes, locating fixtures & position markers etc.

Critical Success Factors

  • Affordable
  • Value for money by delivering within budget and schedule
  • Right, first time delivery during build testing, commissioning, and handover
  • Meets or exceeds all minimum requirements
  • Zero harm safety performance

Storage Pit Lids

  • The Storage Pit Lids are constructed from reinforced heavy concrete (3.8t/cu. m) and fully clad in steel.
  • They are split vertically in interconnecting sections

Value Band

TBD

£

Key Dates

PQQ: Q1 2019

Contract Award: Q3 2019

Site Access: Jan 2020

Completion: Feb 2020

Issue Date: June 26, 2018

Process Stage: Invitation to Tender Released

Attachments:

Status: Ongoing

Update Date: 31/01/2019

What has been Updated: Thank you for your continuing interest in the pit lids prototype. The tender is now live.

Register Interest

Description: The European Spallation Source (ESS) Active Cells Facility (Lund, Sweden) will be used to remotely handle and process target station components before shipment to an external waste disposal facility. The Pit Lids are responsible for providing radiological protection such that the 6 Pit Cells are shielded from maintainers in the Maintenance Area. The Contractor shall carry out manufacture and delivery (including all required testing, verification and inspection documentation) of the Active Cells Storage Pit Lids. The Storage Pit Lids consist of 17 concrete sections totalling 400 tonnes and to be installed at the ESS facility.

Prototype strategy

A single pit lid section is to be constructed ahead of the full scope to assess ease of manufacture. Prototype is to be constructed to the same standard as production (including all testing, verification and inspection documentation). Detailed design will be provided by RACE. Successful prototype manufacture shall allow UKAEA to proceed with the remaining lid sections.

Scope (prototype)

  • 1x storage pit lid sections
  • 1x pit lid locating features
  • Including, but not limited to, lifting eyes, locating fixtures & position markers etc.

Scope (full)

Manufacture and delivery (including all required testing, verification and documentation) to a design specified by RACE of the following:
  • 17x storage pit lid sections
  • 6x pit lid locating features
  • Including, but not limited to, lifting eyes, locating fixtures & position markers etc.

Critical Success Factors

  • Affordable
  • Value for money by delivering within budget and schedule
  • Right, first time delivery during build testing, commissioning, and handover
  • Meets or exceeds all minimum requirements
  • Zero harm safety performance

Storage Pit Lids

  • The Storage Pit Lids are constructed from reinforced heavy concrete (3.8t/cu. m) and fully clad in steel.
  • They are split vertically in interconnecting sections

Value Band

TBD

£

Key Dates

PQQ: Q1 2019

Contract Award: Q3 2019

Site Access: Jan 2020

Completion: Feb 2020